Autor: Bernhard Maidl, Leonhard Schmid, Willy Ritz, Martin Herrenknecht, David S. Sturge
Wydawca: Wiley
Dostępność: 3-6 tygodni
Cena: 564,90 zł
Przed złożeniem zamówienia prosimy o kontakt mailowy celem potwierdzenia ceny.
ISBN13: |
9783433016763 |
ISBN10: |
3433016763 |
Autor: |
Bernhard Maidl, Leonhard Schmid, Willy Ritz, Martin Herrenknecht, David S. Sturge |
Oprawa: |
Hardback |
Rok Wydania: |
2008-04-16 |
Ilość stron: |
356 |
Wymiary: |
245x170 |
Tematy: |
TN |
This book covers all aspects of TBM tunnelling: boring, driving, muck clearance, support, rock classification for mechanical tunnelling and also contract considerations.
A multitude of example projects clarify the current state of the technology, and problem cases are discussed along with innovative solutions and special equipment.
The close collaboration of expert authors has produced a work of interest to the experienced tunnel builder just as much as the newcomer to the field.
Spis treści:
1. Historical Development and Future Challenges.
2. Basic Principles and Definitions.
2.1 Basic Principles and Construction.
2.2 Definitions and Terms.
3. Boring Operation.
3.1 The Boring Process.
3.2 The Cutter Head.
3.3 Cutting Tools.
3.4 The Main Drive.
3.5 Advance Rate.
3.6 Special Types.
4. Thrust.
4.1 General.
4.2 Advance with Gripper Clamping.
4.3 Advance with a Shield TBM.
5. Material Transport.
5.1 Material Transport at the Machine.
5.2 Material Transport Through the Tunnel.
6. Backup Equipment.
6.1 Backup Concept.
6.2 Design Specifications.
7. Ventilation, Dust Removal, Working Safety, Vibration.
7.1 Ventilation.
7.2 Dust Removal.
7.3 Occupational Safety and Safety Planning for TBM Operation.
7.4 Vibration.
8. Additional Equipment.
8.1 Investigation and Improvement of the Geological Conditions.
8.2 Equipment for Rock Support.
8.3 TBM Steering.
8.4 Surveying.
9. Tunnel Support.
9.1 General.
9.2 Support System and Advance Rates.
9.3 Systematic Support at the Machine.
9.4 Shotcrete Support.
9.5 Localised Support.
9.6 Stabilisation Ahead of the Cutter Head.
10. Gripper TBM and Shield Machine Combinations.
10.1 Roof Shields.
10.2 Roof Shield and Side Steering Shoes and Cutter Head Shields.
10.3 Walking Blade Gripper TBM.
10.4 Full–Face Shield Mac
hines.
10.5 Double Shields.
10.6 Slurry Shield Machines.
10.7 Shields with Screw Conveyors.
10.8 Micro Machines for hard Rock.
11. Special Processes: Combinations of TBM Drives with Shotcrete.
11.1 Scope of Application.
11.2 Constructing Options.
11.3 Examples.
12. Geological Investigations and Influences.
12.1 General.
12.2 Influences on the Boring Process.
12.3 Influences on the Machine Clamping.
12.4 Influences on the Rock Support.
13. Classification for Excavation and Support.
13.1 General and Objectives for Mechanical Tunnelling.
13.2 Calssification Systems.
13.3 Standards, Guidelines and Recommendations for the Classification of Mechanised Tunnelling.
13.4 Classification Suggestion by the Authors.
14. Tendering, Award, Contract.
14.1 Procedure Examples.
14.2 Procedure in the Netherlands.
15. Tunnel Lining.
15.1 General.
15.2 Design Principles for Tunnel Linings.
15.3 Lining with Concrete Segments.
15.4 Cast in–situ Linings.
15.5 Shotcrete Layers as the Final Lining.
15.6 Structural Investigations.
16. Examples of Completed Tunnels.
16.1 Tunnel Excavation with Gripper TBMs.
16.2 Tunnelling with Shield TBMs.
16.3 Inclined Shaft Tunnelling with Double Shield.
References.
Index.
Nota biograficzna:
About the authors:
The four authors work in various areas of tunneling.
Bernhard Maidl has been Professor for Civil Engineering, Tunneling and Construction at the Ruhr–Universität in Bochum since 1974. In 1979 he founded the engineering firm Maidl und Maidl in Bochum, which is involved in many large and complex tunnel projects in Germany and abroad.
Dr. Herrenknecht is the Founder and Chairman of the world′s leading mechanized shield tunneling company.
Leonhard Schmid is a planner of tunneling projects and manager of a Swiss engineering firm.
Willy Ritz was formerly manager
of a tunneling company in Switzerland and has a great deal of experience in the construction sector.
Okładka tylna:
This book covers all aspects of TBM tunnelling: boring, driving, muck clearance, support, rock classification for mechanical tunnelling and also contract considerations.
A multitude of example projects clarify the current state of the technology, and problem cases are discussed along with innovative solutions and special equipment.
The close collaboration of expert authors has produced a work of interest to the experienced tunnel builder just as much as the newcomer to the field.
Książek w koszyku: 0 szt.
Wartość zakupów: 0,00 zł
Gambit
Centrum Oprogramowania
i Szkoleń Sp. z o.o.
Al. Pokoju 29b/22-24
31-564 Kraków
Siedziba Księgarni
ul. Kordylewskiego 1
31-542 Kraków
+48 12 410 5991
+48 12 410 5987
+48 12 410 5989
Administratorem danych osobowych jest firma Gambit COiS Sp. z o.o. Na podany adres będzie wysyłany wyłącznie biuletyn informacyjny.
© Copyright 2012: GAMBIT COiS Sp. z o.o. Wszelkie prawa zastrzeżone.
Projekt i wykonanie: Alchemia Studio Reklamy